Bathroom Floor Repair & Painting
Scope of Work:
- Removal of existing toilet and vanity.
- Demolition of old tile and subfloor.
- Installation of plywood and cement board.
- Application of tile adhesive.
- Installation of tiles.
- Application of grout.
- Installation of toilet, vanity, and caulking.
- Repair of water-damaged wall.
- Patching and preparation of ceiling for painting.
- Patching and preparation of wall for painting.
- Painting of the ceiling (two coats of paint).
- Painting of the wall (two coats of paint).